Good morning! I would like to apologize for the prolonged silence because I was busy building a room for my own office. Historically, there are times when I work from home and I needed a place where I could fully dedicate myself to my favorite work and not be distracted by household matters. So I decided to build myself an office room in my house. It took about two months, and I was busy almost every day from morning till evening. But now all that is behind me, and I can get back to my projects.

In addition to the office, my wife wanted us to have a glazed balcony where we could grow flowers, so the office downstairs became the foundation for the balcony above. Here’s what it looked like at the very beginning:

IMG_9079_hu15d924b5ac2677b782c9752abf8ce930_4584389_1600x0_resize_q75_h2_box.webp

For the construction of the room, we needed to hire an architect who would develop the project and coordinate it with the city authorities, and then develop a construction plan together with an engineer. When all the permits were obtained, and we got permission to build, we started construction. There was no space for permitted construction in the front yard, so we decided to build the room in the backyard. For the work, we decided to go with an Arab contractor, and, jumping ahead, we were very pleased with the result.

IMG_9084_hu0ade1b414bd368c6efb911d356bb5141_3790799_1600x0_resize_q75_h2_box.webp

At the very beginning, our plans were slightly disrupted by a rock on which the house stood, which required some changes to the original plan, but the engineer approved everything, and we started pouring the foundation. It turned out a bit larger because we couldn’t dig into the rock, and a base had to be made for the columns. A huge truck with concrete arrived, and the process began. To check the quality of the pour, a concrete sample is taken during pouring. The guys arrived and took a sample straight from the mixer.

IMG_9104_hu86e77ab7c46b2ac029eba7601f278f22_2298648_1600x0_resize_q75_h2_box.webp

By morning, the concrete had hardened enough to start building the walls. We first launched the responsible four-legged supervisor, and he immediately got down to business.

IMG_9131_huc3b0e930ec3539bf1e725e6d3771bb45_2255092_1600x0_resize_q75_h2_box.webp

Then the workers came and started building the brick walls. Everything went quite quickly, and by evening, the walls were almost ready.

IMG_9142_hu68270923c3af6969f3145bf07e829b0c_3076681_1600x0_resize_q75_h2_box.webp

The next day, the workers arrived and began to build formwork for the columns and then pour concrete. We left one column for checking the quality of the concrete the next day.

IMG_9151_hu6957a0b5d46731ab88cdb96b6fac4a30_3310787_1600x0_resize_q75_h2_box.webp

After pouring the columns, they started building formwork for the ceiling. In the room itself, they placed columns and laid wooden beams on them. Then they laid reinforcement. After that, the story with the mixer repeated itself, and we poured the ceiling. As a bonus, we poured concrete between the building room and the pergola.

IMG_9224_hu9566d08c0ab9c70b3772fee525bb3588_2760264_1600x0_resize_q75_h2_box.webp

When the concrete on the balcony had set, we raised brick walls and laid the final layer of reinforcement and poured concrete. The outlines of the room and the balcony appeared.

IMG_9238_huff528d2bce299ee7810d0278634e53ae_2820355_1600x0_resize_q75_h2_box.webp

We removed the outer formwork, transplanted all the roses to the front yard, and scattered soil around the yard.

IMG_9257_hua6336d9e28f426de9334f7502d55656e_3115338_1600x0_resize_q75_h2_box.webp

One of the air conditioners ended up in the passage, and the other was inside the room, so we moved them to the roof, concealing all the pipes in boxes. We decided not to groove the walls. The heat was terrible, and the workers worked from morning till night. But everything was done within the day. The guys did a great job. Everything was done quickly and with quality.

9C924BAB-E85A-44B8-8E77-F76915BC5077_hue4b0d908e60ea5331c2ecd59d3b7b810_2817008_1600x0_resize_q75_h2_box.webp

We laid tiles on the balcony and window, then moved on to rough plastering.

IMG_9405_hu5fab4f6e0a97da2b3a2e09ce2b10ac11_2722605_1600x0_resize_q75_h2_box.webp

After that, we applied the finishing touches. A tiler came and laid tiles in the room and the passage.

IMG_9433_hu721200cdd561b335e7827b681dd9ead9_2775861_1600x0_resize_q75_h2_box.webp

Jumping onto the balcony through the window got tiresome, so it was time to cut a door. The expansion on the second floor began.

IMG_9448_hu068839bd03b59c3c5de4b6aac0a1a066_1120342_1600x0_resize_q75_h2_box.webp

We sealed the balcony with bitumen and tiled it. Then we connected the electricity and water. The final finishing stage began. We installed doors and windows. The walls were painted in a light sandy-yellow color. Most likely, we’ll paint the entire house like this.

IMG_9599_hu997897e72a8e7b2bf0355c2118c4b7dd_875856_1600x0_resize_q75_h2_box.webp

When everything was completed, under the supervision of the responsible four-legged supervisor, we began to furnish the room with furniture and appliances.

AA2E04F3-0620-4361-89C0-15EAD983D737_huc4ee61b77a99df8a23c55753dede1ecc_652999_1600x0_resize_q75_h2_box.webp

This is not the final version, but it’s already workable. For now, all the items that were in the guest room where I worked, we simply moved to the new office and will arrange them properly later.

IMG_9639_hue5e5e2504c4bf695771eb5fbcdbb4b56_2219226_1600x0_resize_q75_h2_box.webp

That’s the story. I am very pleased with the result. The room turned out to be very cozy and warm. I have spent several evenings in it already and I really like it. I think it was a good investment of money and time. I hope you enjoyed this story and you read it with pleasure.

Next on the agenda is the glazing of the balcony and the construction of a pergola over the entrance to the room.